Maximizing the energy production


Efficiency targets not being met?
BMA’s expertise will get you what you need: The highest possible energy efficiency!

The main goal of the project was to optimize a 25MW biomass cogeneration plant. The client sought out our expertise to guide them through the optimization process in order to reach their efficiency goal. BMA’s mission was to improve maximum capacity while taking into account various operating parameters of the existing installation (biomass, humidity, volatile particles, ash, clinker, etc.), and to support the client in several re-hauls of specific components, thus optimizing combustion.

Biomass cogeneration
Ontario, Canada
2015 – current



Preliminary and detailed engineering

On Site Assistance

Testing and start up of various solutions

Performance reports



Design of new concept low NOx burners

Previous Project

Fuel conversion to biomass

Next Project