The main goal of the project was to optimize a 25MW biomass cogeneration plant. The client sought out our expertise to guide them through the optimization process in order to reach their efficiency goal. BMA’s mission was to improve maximum capacity while taking into account various operating parameters of the existing installation (biomass, humidity, volatile particles, ash, clinker, etc.), and to support the client in several re-hauls of specific components, thus optimizing combustion.

Client
Biomass cogeneration
Localisation
Ontario, Canada
Year
2015 – current


 

Services

Preliminary and detailed engineering

On Site Assistance

Testing and start up of various solutions

Performance reports


 